FAT Report
The FAT (Factory Acceptance Test) Report section allows users to compare a set of target parameters defined by the user with those actually recorded on the machine over a specified time interval corresponding to the FAT session. The FAT session is the final test conducted by the manufacturer to verify that the machinery or system meets all the required technical and functional specifications before delivery to the customer.

At the top of the section, there is a card that allows, with appropriate administrative permissions, the selection of parameters to monitor, the specification of the time interval, and the addition of any supplementary information, such as notes or observations from the operator who conducted the FAT (Figure B).

In the lower part of the page, the results of the comparison between the set target parameters and the actual recorded values are displayed. To facilitate understanding, a symbol indicates whether the actual parameter has met the expected value. Additionally, further information is available, including key performance indicators (KPIs), the time spent in different states categorized by type and subcategory, as well as a Pareto analysis of machine downtimes.